Long Khánh - Xã Bảo Vinh : Socio – economic potentials Long Khánh - Xã Bảo Vinh
 

Socio-economic potentials

 

1. LABOR

- Total number of households in Bao Vinh: 4,330 households

- Total number of people: 16,177 people

- The number of people at their working age: 12,133 people

+ The rate of industrial labor: 27.8%

+ The rate of agricultural labor: 26%

+ The rate of commercial labor: 12.5%

+ The rate of service labor: 11.7%


2. LAND

- Total natural area: 1,579.4 ha, accounting for 100%

- Agricultural land area: 1,237.4 ha, accounting for 78.34%

3. LANDSCAPE, TOURISM, AND HISTORIC SITES

- Historic sites: the Vinh Biet T-junction historic site, which is now the Ong Phuc T-junction bordering between Bao Vinh A, Ruong Hoi and Ruong Lon hamlets. This is the place where many battles of the guerrillas of Bao Vinh and of the Long Khanh town’s special task force occurred, and where a lot of enemies were killed.

4. COMMUNICATION

Bao Vinh has a communal culture post office, the Internet, and a land phone system covering 5 out of 5 hamlets, meeting the public communication demand. A system of loudspeakers has been installed in all over the hamlets. Also, Bao Vinh’s radio station is fully equipped with devices and operates effectively to broadcast and disseminate propaganda information the Party’s guidelines and policies and the State’s laws to the people in order that they can master and obey the law.

5. TRAFFIC

In terms of Bao Vinh’s rural roads: up to now is 10.6 km of inter-commune roads has been asphalted, reaching 100%; approximately 13.92 km of hamlet and village roads has been asphalted and concreted, accounting for 86%, and the rest of roads have also been concreted to create favorable conditions for the children and people inside and outside Bao Vinh to travel and transport goods to help reduce the input costs for laborers, stabilize their life, develop a household economy, shorten the gap between rural and urban areas, improve its landscape to meet local  people’s legitimate aspirations.

The total length of Bao Vinh’s asphalted and concreted roads is 24.52 km and the length of the soil road is 2.2 km.

Lượt Truy Cập